Creekfront project · Garden City, SC

Pierhead & Floating Dock Repair in Garden City

A new metal roof above. Replacement flotation below. Waterbridge repaired this homeowner’s covered pier, floating dock and gangway on the Garden City creek.

Call 843-685-8355
Metal-roof covered pierhead, railed gangway and floating dock beside the creek in Garden City, SC
The covered pierhead and gangway leading to the floating dock on the Garden City creek.

The repair scope

From the covered pier
to the floating dock.

This waterfront homeowner’s project brought several repairs together: the covered pier’s roof, the floating dock’s flotation, the gangway, and the wood railings and boards.

Waterbridge installed a new metal roof on the covered pier. At the floating dock, the crew replaced failed dock flotation and repaired the connecting gangway. Railings and boards were also replaced and reinforced.

The project photograph shows how those structures connect. The covered pierhead stands over the creek, with a railed gangway leading down to the floating dock. The work addressed several parts of that waterfront access in one project.

Work completed

Three parts of the repair.

Covered pier roof

A new metal roof was installed over the existing covered pierhead.

Flotation and gangway

Failed flotation was replaced beneath the floating dock, along with repairs to the gangway connecting it to the pier.

Railings and boards

Wood railings and boards were replaced and reinforced as part of the pier and dock repairs.

Let’s look at your waterfront

Start with the repairs
you need.

Request a free property assessment. Mention this Garden City pierhead and floating dock project if it helps explain what you have in mind.

Call 843-685-8355