Open pierhead terraces
Fish, relax, and move easily around the open deck.

The end of your pier—make it a spot you crave
A pier’s end isn’t a dead end. It can become the place to sit, fish, gather, and escape by the water—with open and covered space planned together.
Picture your Myrtle Beach pierhead
The pierhead is the last stop—where standing around becomes outdoor living.
Leave it open for fishing or lounging. Cover part with a gazebo. Or blend both so everyone gets a spot without crowding the path.
Waterbridge builds and revives mixed-use pierheads for homes and businesses around Myrtle Beach. Walkway, railings, roof, supports, and water access are planned as one structure—not a string of disconnected tasks.
Planning a roof that extends from shore to the outer end? See our covered pier guide.
Fish, relax, and move easily around the open deck.
Coordinate the roof, posts, drainage, railings, and supports below.
Find wear, leaks, corrosion, or movement before deciding what stays.

Design starts with what’s underfoot
A larger deck or gazebo adds load. Existing pilings and framing may need repair or reinforcement before they carry a new roof or a wider use area.
Waterbridge assesses the whole structure—from roof and railings to pierhead supports, walkway, and water access.
One spot—endless options
Plan the shade, open terrace, fishing corners, and water access before worrying about finish colors.
Plan seating and walkways for the people who will use the space—not square footage alone.
Balance posts, rails, shade, and furniture without blocking the view.
Keep casting and cleaning clear of seating, ladders, and walkways.
Leave room for gangways, lifts, tie-off points, and vessel movement.
Place covered space around sun, rain, breeze, drainage, and daily use.
Leave access for cleaning, inspections, roof work, lighting, and utilities.
Structure, finish, exposure
Decking, railings, roof, and connections must fit the site, intended use, and maintenance plan.
Start with the load path. The platform and roof depend on what carries them.
Compare grip, heat, appearance, maintenance, and how the railings meet each use zone.
Coordinate posts, roof form, fasteners, drainage, and open sides with the pierhead.
Plan gangways, docks, lifts, ladders, lighting, and utilities with the pierhead—not as add-ons later.

Pierheads in their full waterfront setting
Past projects show pierheads joined to walkways, gangways, and floating docks as one connected waterfront system.




From “wondering” to “let’s do this”
Photos and ideas start the conversation. The property assessment connects them to the structure, water, access, and likely approval path.
Share the property, existing pier, who uses it, seating, shade, fishing, and boat access.
Review footprint, supports, condition, exposure, current permits, access, and connections.
Define open and covered zones, structural work, finishes, transitions, and next steps.
I live up north and the project was completed without me ever seeing the progress. When I came down, the project was better than I could have thought! The quality speaks for itself.
Joe P. · Waterbridge customer
A finished pier is only the start
The project gallery shows the work. Customer reviews describe the experience.
A few things waterfront owners ask first
These answers get ideas moving. The property, existing structure, and applicable approvals still determine the plan.
A pierhead is the outer end of a pier. It can be open deck space, a covered gazebo, or a mix of both.
Yes. Open space can preserve views and casting room while a roofed section adds shade. Plan seating, fishing, and boat-access paths together so one use does not crowd another.
Sometimes. Existing pilings, framing, bracing, connections, condition, and the approved footprint must be assessed first.
They may. In South Carolina's coastal critical area, the approval path can differ for a roof on an existing pierhead and for work that increases the structure's square footage. The property and current permit should be reviewed before the scope is promised.
Start with your property
Start with clarity