New dune crossover construction
Set the alignment, supports, surface, stairs, landings, and railings around the dune and its users.

Beach access built around the Myrtle Beach dune
Build beach access around the dune, users, and exposure.
New construction, repair, and replacement
A well-planned crossover creates stable beach access while keeping traffic out of surrounding sand and vegetation.
Waterbridge builds and repairs dune crossovers for homes, HOAs, resorts, and commercial properties in Myrtle Beach and Horry County.
The scope begins with the building connection, dune profile, beach approach, and existing structure.
Set the alignment, supports, surface, stairs, landings, and railings around the dune and its users.
Address deteriorated decking, loose rails, weak framing, damaged fasteners, unstable stairs, or movement in a serviceable structure.
Compare selective work with a rebuild when age, storm damage, settlement, or the route limits another repair.

Read the complete path
A soft board may be local wear, but leaning rails, loose stairs, corrosion, or settlement can reveal a larger condition.
Waterbridge reviews the full route before defining repair or replacement, so a surface fix does not hide the cause.
One route. Six connected decisions.
Alignment, elevation, structure, transitions, users, and coastal exposure should be resolved together before construction begins.
Connect the home or shared property to a sensible beach-side landing.
Follow the existing profile while coordinating elevation, supports, and clearance with the site and review requirements.
Resolve grade changes with deliberate runs, turns, landings, and transitions.
Plan high-use safety details with the frame and expected users.
Match width, access control, and durability to the property's traffic.
Keep routine traffic on the structure and plan construction access carefully.
Structure, surface, and exposure
Materials must fit the spans, fastening pattern, drainage, exposure, traffic, and maintenance plan.
Posts, bracing, beams, and joists need appropriate treatment, spacing, and connections.
Compare traction, heat, sand movement, board span, fastening, appearance, and ongoing care before choosing the walking surface.
Fasteners, bolts, brackets, and connectors should suit the assembly and coastal exposure.
Edges, stairs, landings, gates, and connection points should drain, resist movement, and remain comfortable in daily use.

Recent Waterbridge work
January 2026: two natural-wood crossovers and one white crossover built for neighboring Myrtle Beach oceanfront homes.




From concern to clear next step
Photos and ideas help start the conversation. The property assessment connects them to the water, structure, access, and likely approval requirements.
Review the building connection, dune, vegetation, grade, existing structure, beach approach, users, and visible repair concerns.
Coordinate elevation, width, supports, materials, stairs, landings, railings, access, and likely permit requirements.
Complete the agreed work, protect the surrounding area, and check the landward connection, walking surface, and beach-side landing.
We did a major rehab to our 17-year-old pier, walkway, and pierhead. Waterbridge handled all aspects of the job, kept it on budget, and met or exceeded the scope.
Rich V. · Waterbridge walkway customer
A finished structure is only part of the result
Browse the marine construction photo gallery for a closer look at finished conditions, or read customer reviews about communication, coordination, and the experience of working with the team.
Common planning questions
These answers are a starting point. Site conditions and local requirements still determine the right scope.
A dune crossover is a defined, often elevated beach access route that carries foot traffic across the dune. The alignment, elevation, supports, stairs, landings, and railings should fit the property and coastal setting.
Yes. Waterbridge reviews accessible posts, framing, bracing, decking, fasteners, stairs, landings, railings, and transitions before recommending targeted repair or broader replacement.
Requirements depend on the address, dune and vegetation conditions, ownership, dimensions, accessibility needs, and scope. The likely approval path should be identified while the route is being planned; approval is not assumed before the property is reviewed.
Yes. Shared and commercial beach access can be planned around expected traffic, width, gates, stairs, landings, railings, maintenance, and the relationship to buildings and public-facing areas.
Waterbridge serves Myrtle Beach and Horry County, plus Georgetown County in South Carolina and Brunswick County in North Carolina. Availability is confirmed for the specific property and scope.
Start with the property
Start with clarity